Competing uses for this stock
| Output | Reference quantity used | Other inputs |
|---|---|---|
| Full Plate | 2 | Gold Ingot, Polish, Fabric, Joining Material |
| Mail Armor | 2 | Joining Material, Leather |
| Bomb | 1 | Paint |
| Hand Cannon | 2 | Oakwood Board, Handle, Joining Material |
| Long Sword | 2 | Oakwood Board, Polish, Handle |
| Pot Grenade | 2 | Paint, Wooden Nails |
| Short Sword | 1 | Fittings |
| Metaphysical Belt | 1 | Silver Ingot, Fittings, Paint |
| Hypnotic Pendulum | 2 | Leather, Fittings |
| Silver Chain | 1 | Silver Ingot, Fittings |
| Silver Ring | 1 | Silver Ingot |
| Slumber Spindle | 2 | Rowan Berry, Joining Material |
| Soil Solution | 3 | Toad's Eyes, Bat's Blood, Spider's Legs, Paper |
| Fittings | 2 | None recorded |
| Joining Material | 2 | None recorded |
Edges are derived from the secondary recipe register. They establish a documented dependency, not verified batch yield, current market availability or an automatic profit estimate.
Use this record for a decision
For Iron Ingot, check Iron Ore before committing a production batch. Reserve enough for Full Plate, Mail Armor, Bomb, Hand Cannon, Long Sword if those outputs are part of the same plan. Inspect the current buy/sell tooltip and keep personal inventory separate from business cargo.
Keep the selected final output in view while reserving inputs. Allocating the same stock to every downstream recipe creates a double-counted plan. Check the actual quantity on hand, reserve it once and budget purchases for the remainder.
Related patch context
Set target stock for crafted goods ↗
Right-click a crafting recipe in a business to choose storage, storefront or a target-stock policy. The September 24 explanation describes sending production above the retained target to the storefront.
Read the price breakdown ↗
Price tooltips now expose more contributing factors, including base price, buying markup, Negotiation and storefront discounts. The current city comparison also shows best and worst prices.
Crafting stops when storage is full ↗
Production now halts and raises a notification when storage is full. A stopped job can therefore be the intended response to an unavailable output destination.