Inspect the right state
Record the repair quote for each affected building and cart. Keep missing integrity separate from maximum integrity: a reference per-point repair rate is not the total bill. Check whether production is stopped by full storage before attributing the stoppage to staffing.
Make the decision
Compare the immediate repair obligations with the expansion payment and your cash reserve. Prioritize the constraint you actually observed. The source tutorial connects integrity with safety and productivity but does not establish a universal percentage return for every repair.
Verify the result
Repair or upgrade one target, then inspect the resulting integrity and task state. Keep quotes from different levels separate, and do not interpolate a missing third-level value from neighboring rows.